Oxnard Freezer Services

        Offload 19,000 lb. Portable Chiller unit on site

    Pismo Beach Water Treatment plant   2020

                          3  units up to 26,000 lb.

              Relocated to new Los Angeles base

      UCSB     

      Tree     

  Removal 

   Project


10 each Eucalyptus Trees  

         Up to 90' Tall

            Spring 2014

   Hollywood Hills

   Offload and install 10 ea. 30' long x 6,000 lb.

rebar cages.  Overlooking Downtown Los Angeles